Hi,

16" dia. – 871.873 km long cross country Crude Pipeline from pumping station PS-01 to terminal TS-01 at 871.873 km including intermediate pumping stations PS-02 at 228.6 km, PS-03 at 448.18 km and PS-04 at 666.991 km. We have carried out transient surge analysis of the pipeline to