Power Flow Problem – 500MW

Problem Statement: Utility-1 is supposed to transfer a pre-agreed 500MW power to Utility-2. However, the power flow is not controlled and often times Utility-2 receives more power than what is agreed.

Can anyone propose a solution or any interconnecting equipment that could be used to resolve thi