Generator Trippings-Simulation

We have generating units where the existing T90GS 4.2 MW machine will be operated in parallel with new SG-400 machine (11-13 MW) at rated load.. If the SG-400 trips while operating in parallel with existing T90GS 4.2 MW machine, then running plant load will be absorbed by the existing T90GS machine

Related Posts

Comments are closed.