Design of Precast Concrete Inverted Siphon

We have a challenge to build a reinforced concrete box culvert siphon with a maximum pressure head of 12meters. Due to the unpredictable weather pattern attributed to climate change we want to construct it using prefabricated sections interlocked with bolted streel connectors. Each section should we

Related Posts

Comments are closed.