210 MW KWU Design Governing System

After COH work on unit, we charge governing rack for trial /setting of valves of TG set. To open EVS/IVS starting device reduce to zero position. At 0 position start up oil and auxiliary stat up oil, trip oil/auxiliary trip oil built up up to normal value. During rise in position of starting device,

Related Posts

Comments are closed.