Exhaust Flue Gas – Duct Material

Hi! My design of Flue gas heat recovery system is complete. I am utilizing heat pipe stack to pre-heat the feed water using the heat from the exhaust flue gases of a boiler. The temp of flue gas at the entry of the system is at 230DegC. I am stuck with the selection of the material for the casing. C

Related Posts

Comments are closed.